What Has Happened So Far

During the pre-application process with the London Borough of Ealing we have arrived at our current height, bulk and massing. This takes into account their feedback on how the building relates to both the surrounding streetscape and to the Brownell Place development to the rear.

Key changes made during the development were to reorient block B to better relate to the massing of Brownell Place, the removal of the undercroft parking and the removal of a floor on block C to better relate to the height of the ambulance site.

01 Massing Stage 1

02 Massing Stage 2

03 Massing Stage 3

04 Massing Stage 4 - Current

Menu
Mobile logo